Mipac to provide Main Automation Contracting for BHP’s West Musgrave Project

Share Post:

2 minute read

Mipac will provide main automation contracting for what is set to be one of Australia’s largest, lowest cost and lowest emissions copper nickel projects – BHPs’ West Musgrave Project –  as announced last month.

The awarding of this contract is testament to Mipac’s extensive experience and mineral processing expertise, and will span two years.

As the Main Automation Contractor (MAC), Mipac will be responsible for delivering a complete and operating integrated process control system (PCS) for the West Musgrave Project, which will monitor, control, ensure plant and asset safety, manage plant operations and achieve business objectives.

Mipac’s Managing Director, Eddie De Rivera, says it is a tribute to Mipac’s strong reputation in the industry:

“The West Musgrave Project is a greenfield operation with a focus on the future. Through its digital roadmap, it aims to become an integrated, connected and optimised mine with connected workers. At Mipac, we are excited to be part of this project and look forward to applying our 26 years of industry experience and passion for innovation to make a real difference on this project.”

Eddie De Rivera, Mipac Managing Director

Tweet

Miipac wins Mest Musgrave MAC

Mipac’s main automation contracting work will focus on implementing technology best practice to ensure a flexible and scalable architecture that will allow BHP [formerly OZ Minerals] to adapt quickly to new technologies (future proof).

Once completed, the site will have fully integrated operational processes and systems, enabling more efficient and dynamic energy management as well as integrated operations, reducing its green footprint as well as the requirement for personnel to be on site.

The West Musgrave process control system will utilise physical and virtual networks to create always-on communication links and integration of all major vendor packages and leading PLC/SCADA technologies to ensure the site is future-oriented and optimised.

The scope of main engineering contracting for the project will span the delivery, design and configuration of a fit-for-purpose control system for the West Musgrave Minerals Processing Plant, project management, engineering and design, PCS hardware and infrastructure, PCS software, data historian and configuration, testing and commissioning, delivery and site installation and documentation.

Deliverables will include project management, engineering drawings, specifications, risk assessments and engineering reports, test procedures, check sheets and PCS configuration files.

Mipac expects the work to take 2 years and engage up to 16 staff.

When it comes to solving complex problems our experience shows we deliver.

Mipac has been delivering operational technology and control systems for more than 26 years. Our teams have completed more than 650 projects for 100+ customers in more than 50 countries around the world. 

Head over to our Projects Page to learn more about some of the results we have delivered for clients, including MAC projects for First Quantum’s Cobre Panama operation and the Kansanshi Smelter.

We work across the mining value chain.

Head back to the home page to find out more about the services and solutions we provide to clients across the mining value chain, including process optimisation, advanced process control and industrial software solutions.

Subscribe

Enter your details to receive our newsletter

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will email you a copy of our TCard brochure.

Simply fill out the below form and we will email you a copy of our MPA product guide.

Simply fill out the below form and we will email you a copy of our SMART Tankhouse brochure.

Download our Capability Statement

Simply fill out the below form and we will email you a copy of our Capability Statement.

[contact-form-7 id="7624"]

Download our OT Vision to Delivery brochure

Simply fill out the below form and we will email you a copy of our Capability Statement.

[contact-form-7 id="7623"]

Simply fill out the below form and we will email you a copy of our E-Learning Brochure.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

[contact-form-7 id="8762"]

Download TCard Case Study

Simply fill out the below form and we will email you a copy of the MIM Case Study.

[contact-form-7 id="8768"]

Register for Webinar

Simply fill out the below form and we will send you the details of the webinar directly to your email.

[contact-form-7 id="8833"]

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Request a
Demonstration

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will email you a copy of our TCard™ product guide.

Simply fill out the below form and we will email you a copy of our MPA Logsheets product guide.

Simply fill out the below form and we will email you a copy of our Digital TARP product guide.

Simply fill out the below form and we will email you a copy of our Capability Statement.

Simply fill out the below form and we will email you a copy of our ShortMeter product guide.

Simply fill out the below form and we will email you our Copper Monitor™ product guide.

Simply fill out the below form and we will email you a copy of our SMART Tankhouse product guide.

Simply fill out the below form and we will email you a copy of our Alarm Manager product guide.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will be in touch to discuss the best time for a demonstration.

Simply fill out the below form and we will email you a copy of our Copper Monitor brochure.