Seqwater project to upgrade the sludge handling system at the Landers Shute WTP, involving decommissioning and replacement of equipment. The control system at site required modification and new PLC for additional equipment.
Project scope
- Provision of new sludge handling remote I/O PLC rack integral to the new MMC
- Full integration of the replacement sludge MCC and proprietary centrifuge control panels into the existing plant PLC and SCADA
- PLC and SCADA programming to fully incorporate the new systems into the existing control solution, including detailed alarm and reporting structure to the new MCS specification
- Participation in HAZOP and CHAZOP workshops
- FAT (factory acceptance testing)
- Reviewing and revising the control functional description document
- SAT, Control System commissioning and operator/maintenance Seqwater staff training
Project highlights
- Cutover was undertaken within the planned/scheduled time with no impact ton Brisbane water production and supply
- All site works carried out met the Seqwater safety requirements with no incidents
- Working with the many stakeholders involved in the project ensured commissioning and cutovers were seamless
Discover more of Mipac's projects
Ok Tedi MPA Location: Papua New Guinea Technical Specs: AVEVA PI System and MPA Ok Tedi increases gold recovery by more than …
GlencoreKamoto Copper Company RtDUET Downtime Reporting Democratic Republic of the Congo Copper, Cobalt Mining Project Overview Kamoto Copper Company (KCC), a Glencore-owned …
Glencore Mount Isa Mines TCard implementation Australia Mining Software Download the case study Background Mount Isa Mines Limited (MIM) operates copper, lead, …
CONTACT US